Make the brief clear
Style, colors, quantity, artwork, size and destination.
With 15 years of cap manufacturing experience in China, Monkey Cap Works helps bring your designs to life. Take a closer look at material preparation, decoration, assembly and finishing. Agree on your sample and order specifications before production moves forward.
Talk through your project ↗
The exact route depends on the cap and decoration. Confirm the steps and schedule for your order.
Style, colors, quantity, artwork, size and destination.
Sample lead time: 2–3 weeks. Check fit, finish and decoration.
Agree on the sample and order details. Bulk production: 3–4 weeks.
Confirm packaging and shipping arrangements for the destination.
Explore 13 production stages. Select “Detail view” to see the matching close-up.

Reviewing the shape and construction of a cap sample.

Preparing and checking the pieces used in assembly.

Handling material rolls and preparing the work area.

Laying out fabric on the cutting table.

Preparing cut pieces for the following production stages.

Working with cap panels and production equipment.

Applying decoration with embroidery equipment.

Joining and shaping cap components at the sewing machine.

Machine work during cap assembly.

Close-up work on seams and cap components.

Working on the final cap form.

Reviewing stitching, construction and finishing.

Preparing finished caps and cartons for dispatch.
Use the approved sample and written specification as the reference. Discuss any measurements, inspection criteria or documentation your project requires.
Share your quality requirements ↗| Appearance | Shape, colors, panel alignment and visible finish |
| Fit & dimensions | Agreed measurements, closure and intended use |
| Decoration | Artwork, position, size, stitching or print finish |
| Construction | Seams, inner band, labels and attachment points |
| Packaging | Labels, quantities, packing method and carton information |
| Special requirements | Confirm any tests, inspection criteria or reports before ordering |

Minimum order: 50 pieces per style per color. Sample lead time is 2–3 weeks; bulk production is 3–4 weeks. Confirm the schedule for your project.
Worldwide shipping is available, with approximately 3–8 days in transit. Actual timing varies by destination, shipping method and customs clearance. Shipping is separate from production.
Share your design, quantities and customization requirements.